热门搜索:

  • /?2
  • 下载费用:10 金币 ?

GM 1960 GP-9 C Capacity Analysis Summary 中英对照.doc

关?键?词:
GM 1960 GP CAPACITY ANALYSIS SUMMARY 中英对照
资源描述:
WWP Supplier Quality GP-9 Run at Rate Attachment C Capacity Analysis Summary ?General Motors Corp. Published by Worldwide Purchasing GM 1960 – C November 2004 Supplier Name: 供应商名 称 Date: 日期 Supplier / DUNS No.: 供应商邓 氏编码 Part name: 零件名称 Plant Location Country 生产厂址 Part number: 零件号 Program: 项目 Drawing Date: 图纸日期 Model Year: 车型年份 Eng. Change Level: 工程更改 等级 CAPACITY ANALYSIS 产 能分析: Yes No N/A Comments 1. Has the “Process Flow Diagram” (reflecting all internal assembly and sub components lines) been sketched on Attachment C-1? “生产流程示意图”是否准确反映了所有内部零件和分零件生产线,并作为附件 C-1? 2. Are post process buffers managed to off-set the effect of variability for all non-constraint lines? 各工位间是否有足够的库存件用来抵消非瓶 颈生产线的波动产生的影响? 3. Has the service parts (after market) requirement been factored into the demand? (Note: Total customer requirement must include service parts (after sales) requirements) 生产能力是否能满足客户所 有需求( 包括售后服务需求) ? 4. Does the constraint operation have sufficient buffers (before & after) to isolate it from system variation? 瓶颈生产线(或生产工位)前有足够的缓冲件、瓶颈生产线(或生产工位)后是否有足够的缓 冲区 用来保证 瓶颈生产线(或生产工位)不受生产系统波动的影响? - Are the buffer profiles controlled and documented? 是否对缓冲件状态进行控制并文件化? - Part(s) buffer before constraint: - 瓶颈生产线(或生产工位)前 的缓冲件 MIN MAX - Space buffer after constraint: - 瓶颈生产线(或生产工位)后 的缓冲件 MIN MAX - Is offload/onload responsibility assigned and itemized in operator instructions? - 是否在操作指导书中 将卸/ 装货职责进行了分配及说明? 5. During the run at rate analysis, did the system run under normal operating conditions? (For example, under total customer requirement, normal operating shifts/hours, normal part mix, etc.) GP-9 运行是否在正常的生产状况下进行的? 6. Were “Normally Scheduled” changeovers performed during the run at rate analysis? GP-9 分析中是否包括计划 的工装更换? -Changeovers performed: Shift 1 Shift 2 Shift 3 工装更换进行 于 第一班 第二班 第三班 7. During the run at rate analysis, did the throughput of the MANUFACTURING system meet or exceed the contracted capacity (including normal service parts (after sales) requirement) under total customer requirement? 在进行 GP-9 运行分析时,生产线最终合格产量是否满足或超过合同生产能力( 包括售后服务产量需 求) ? - “ALL CUSTOMERS” Total Net Good parts produced - “所有顾客” 合格的产品数 Total 总数 Shift 1 Shift 2 Shift 3 - “Run @ Rate STUDY” Total Net Good parts produced - GP-9 生产运行时生产的合格产品数 WWP Supplier Quality GP-9 Run at Rate Attachment C Capacity Analysis Summary ?General Motors Corp. Published by Worldwide Purchasing GM 1960 – C November 2004 Total 总数 Shift 1 Shift 2 Shift 3 8. During the run at rate analysis, did the throughput of the CONSTRAINT operation meet or exceed the contracted capacity (including normal service parts (after sales) requirement) under total customer requirement? 在进行 GP-9 运行分析时,瓶 颈生产线( 或生产工位) 的合格品净产量是否满足客户所有产量需求 (包括正常的售后服务零件)? - “ALL CUSTOMERS” Total Net Good parts produced - “所有顾客”合格的产品数 Total Shift 1 Shift 2 Shift 3 - “Run @ Rate STUDY” Total Net Good parts produced - GP-9 生产运行时生产的合格产品数 Total Shift 1 Shift 2 Shift 3 Result: 结论 Pass Fail Staged Follow-up date 验 证日期: Filled in by: Phone: 填 写者 E-mail: Comments 备注:
? 汽车智库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
0条评论

还可以输入200字符

暂无评论,赶快抢占沙发吧。

关于本文
本文标题:GM 1960 GP-9 C Capacity Analysis Summary 中英对照.doc
链接地址:http://www.autoekb.com/p-9350.html
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服客服 - 联系我们

copyright@ 2008-2018 mywenku网站版权所有
经营许可证编号:京ICP备12026657号-3?

收起
展开